Design engineering of basic MEP systems with HVAC prominence has been the spectrum of scope. The infrastructural facilities of main energy resources of mall like provision of chilled water, availability of power source were used for design engineering as well as design coordination of MEP services of these retail outlets.
About the project
Retail outlets normally impose huge challenge due to acute space constraints .. Client also used to be demanding to increase false ceiling heights to maximize usable space as a end user . Hence accommodating MEP services with in relatively smaller space above false ceiling was a big challenge. The presence of structural beams on ceiling slabs added to gravity of same more.
Second big challenge is to design HVAC low side equipment to take care of maximum peak load of people, lights, and other parameters and also to economize the power consumption during off load hours. Hence use of EC motors, VFD drives, 3 way mixing valves were used for optimizing power consumption of HVAC system parameters.